Skip to item: of 608
Information about this record Back to top
Open in Universal viewer
Open in Mirador IIIF viewer

'REPORT ON THE ADMINISTRATION OF THE BOMBAY PRESIDENCY FOR THE YEAR 1902-1903' [‎43v] (80/106)

The record is made up of 1 item (53 folios). It was created in 1904. It was written in English. The original is part of the British Library: India Office The department of the British Government to which the Government of India reported between 1858 and 1947. The successor to the Court of Directors. Records and Private Papers Documents collected in a private capacity. .

Transcription

This transcription is created automatically. It may contain errors.

Apply page layout

Chap. IV.
PRODUCTION
AND
DISTRIBUTION.
Shikarpur Bunds.
56
BOMBAY ADMINISTRATION REPORT.
[1902.1983
Gliar Bunds.
Nara Bunds.
Kar&chi Bunds.
Surveys.
N&ra Supply
Channel.
The Eastern N&ra,
Mithrau Canal.
Heran Canal.
Kkipra Canal.
Thar Canal.
Hiral Canal.
Jarnrao Canal.
Extensions and Improvements to the Sukkur-Begari Bund were carried out at a tot l
cost of Bs. 1,754 against the estimate of Rs. 2,099. Two new loop bunds were complete)
at a cost of Rs. 61,026 and Rs. 64,519 respectively, and another estimated to cot
Rs. 49,082, was commenced, and an expenditure of Rs. 3,000 incurred. General repai!
cost Rs. 8,860,
Owing to the low inundation the water did not reach the Ghar bunds in several places
and no breaches, or even leaks, occurred.
Loop bunds were constructed in portions of the Lashari Bund, Nangesha Bund and
Abad Bund, where the river was threatening and the work was practically completed
There was active erosion of the river bank opposite the Abad, Nangesha and Fatelrnmi
Bunds. Owing to the low inundation water did not touch the bunds in any part.
The river was so low that only in the Shahbander and Jerruk Sub-divisions were the
bunds touched at all. The chief works carried out were: raising and strengthenin')
portions of the Mulchand-Shahbander and Panah-Baghar, and Baghar-Uchito Bunds • con
struction of a head regulator over the IsTasir Wah; and other minor works of small
importance. The expenditure during the year on these works was Rs. 31,851.
expenditure on maintenance and repairs during the year was Rs. 39,567.
During the season the cadastral survey of lands in the Khelat territory, settled on the
Desert and Begari Canals, was in progress. An area of 153,087 acres or 239 square miles
was surveyed. Fifty-two villages in all have been dealt with, and the village maps have
been made in accordance with tribal boundaries and of a size suitable for revenue purposes
No expenditure was incurred on earthen boundary marks. The demarcation was solely
undertaken and completed by the land-holders. In addition to the earthen boundary
marks, stones have been erected at the corners of the survey numbers in the areas subject
to flooding by hill torrents. The net outlay, excluding Establishment and Tools and Plant
charges, was Rs. 41,814. The surveys in connection with the proposed remodelling of the
Begari Canal were virtually completed, the expenditure during the year being Rs. 2 916
The preparation of the project has now been taken in hand. During the year an expendi
ture of Rs. 5,839 was also incurred in making a contour survey of the Begari Canal which
approached completion. The contour survey (field work) of the Westera Nara District
wag continued and almost completed, the total outlay during the year being Rs. 9 735
Rs e 50 UrVey ta ^ en ^ 0r ^ r ° un ^ WsiF extension was also completed at a cost oi
Indus Left T>(bnk Division,
Q 13p ? ly h 2 * 11 ,™ 116 g au g eread 21 feet and over con&mcmsly
Toh ^ !° S epte “ ber 26th, the highest depth available and admitted being 23'2 ieet,
against l m 1 ^ 01 . Ihere were no floods.
1 SU PP^ the Eastern Nara was equal to that of last year, and an increase of about
I,5UU acres is expected, both m kharif and rabi.
Canafa^fn W f e p e cai ™ c l out Proposed embankment on the right bank of the Mithrau
saTct oned n PqV e Tr 0f the Band o at a Cost of Rs ‘^ These works were
embankment* «nt| 5,Cam ? d °S t m 1898 to the extellt of Rs - 2 > 858 on th e Mithrau
til'be k ^el d f° f E ?' °? , 1 323 0n the Rata Bund extension. The remainder of the work
viii be carried out next cold season.
Rs Pf dis , trib . UtarieS Wel,e maintaia ed in good order at a total cost o!
re^ectively, above SseTf 1901*. areaS ^ t0 b6 ab ° Ut 4 ' 30 ° and ^ 30 ° 3Cres ’
an increase^ ran Canal WaS ° pen throa g llout tbe year, and the cultivation is likely to show
^ tt^expen■ idbrnre* 1 being*Rs™iS^SyPagainst°the^*estimate^ oPrsTb, 8^ 2 l amenoed d -"
2,000 acres, andTdm-else^ntobofnrabr 68,36 * S eXp0 ° ted 0n the kharif area of about
reguktorsTndthe biSge^J!™ 1 the f f^ork in the main canal and minors, the
project was completed g early in 1903 y 04 OmP >B te fB ^ & ^ of and the whole
Out of 31 villao-es land ha^Bpo • " ’ bhe exception of outlets to water-courses.
colonists fromhm'Thar Ikh-kar'lksert!^ ^ 19> ^ 12 be “ g reSe " ed &r
Rs.l.SS^S^rfor^Worka 6 ’’^? 1 ex P!) lldit y re . of the y ear was Rs- 2,65,524 of which
minors, regulators bridges bnilrb* U prmci P al works were escape sluices at the tails of
most of which were in ,■/'Sr,,,f-!-, n ‘‘y < l ’ iulet,s to water-courses and contour surveys,
favourable. The groyneToSis 47 47?°i 1 The conditiolls a * *^6 Head Works are most
above the Left Upstream Training l * 3 ihf 01-0 fte on the left bank of the Nara,
upsti earn iiammg bank have worked well, and there are no scour holes near

About this item

Content

Annual administration report of the Bombay Presidency The name given to each of the three divisions of the territory of the East India Company, and later the British Raj, on the Indian subcontinent. , providing a summary record of the main events and developments in each department of the Government of Bombay From c. 1668-1858, the East India Company’s administration in the city of Bombay [Mumbai] and western India. From 1858-1947, a subdivision of the British Raj. It was responsible for British relations with the Gulf and Red Sea regions. during the financial year 1902-03. The report was printed at the Government Central Press, Bombay [Mumbai] in 1904.

The report is divided into two parts. Part I contains a report ‘SUMMARY’ (ff 7-14). Part II comprises chapters I-IX (ff 15-56).

PART II comprises the following:

  • ‘CHAPTER I. TRIBUTARY STATES’ (ff 16-22), consisting of: I. North Gujarat; II. South Gujarát; III. North Konkan; IV. South Konkan; V. The Dakhan [Deccan]; VI. Southern Mahratta Country States; VII. Sind [Sindh]; VIII. Aden
  • ‘CHAPTER II. ADMINISTRATION OF THE LAND’ (ff 23-25), consisting of: 1. Realization of Land Revenue; 2. Surveys; 3. Settlements; 4. Waste Lands; 5. Wards’ and Other Estates; 6. Revenue and Rent-paying Classes
  • ‘CHAPTER III. PROTECTION’ (ff 25-30), consisting of: 1. Course of Legislation; 2. Police; (no item 3) 4. Chemical Analysis; 5. Criminal Justice; 6. Prisons - Civil and Criminal; 7. Civil Justice; 8. Registration; 9. Local Board Administration; 10. Municipal Administration; 11. Military (Volunteering); 12. Marine
  • ‘CHAPTER IV. PRODUCTION AND DISTRIBUTION’ (ff 30-46), consisting of: 1. Agriculture; 2. Weather and Crops; 3. Horticulture; 4. Forests; 5. Mines and Quarries; 6. Manufactures and Industries; 7. Trade; 8. Public Works; 9. Irrigation; 10. Railways; 11. Tramways
  • ‘CHAPTER V. FINANCIAL REVIEW’ (ff 46-51), consisting of: 1. Financial Review, 1902-1903; 2. Mint; 3. Currency; 4. Land Revenue; 5. Irrigation Revenue; 6. Public Works Revenue; 7. Customs; 8. Opium; 9. Salt; 10. Excise; 11. Cotton Duties Act; 12. Stamps; 13. Income Tax; 14. Forests; 15. Local Funds; 16. Municipal Revenue
  • ‘CHAPTER VI. VITAL STATISITICS AND MEDICAL RELIEF’ (ff 52-53), consisting of: 1. Births and Deaths; 2. Emigration; 3. Immigration; 4. Medical Relief; 5. Lunatic Asylums [psychiatric hospitals]; 6. Sanitation; 7. Vaccination; 8. Veterinary
  • ‘CHAPTER VII. INSTRUCTION’ (ff 54-55), consisting of: 1. Education; 2. Literature and the Press; 3. Arts and Sciences
  • ‘CHAPTER VIII. ARCHAEOLOGY’ (f 56)
  • ‘CHAPTER IX. MISCELLANEOUS’ (f 56), consisting of: 1. Ecclesiastical Jurisdiction; 2. Stationery; 3. General Miscellaneous.

A table of contents listing the headings and sub-headings of the report is on folio 6. In a small number of instances, there are discrepancies in the spelling, phrasing or inclusion of sub-headings between the table of contents and the body of the report. In these cases, the sub-heading as it appears in the body of the report is included above.

Extent and format
1 item (53 folios)
Written in
English in Latin script
View the complete information for this record

Use and share this item

Share this item
Cite this item in your research

'REPORT ON THE ADMINISTRATION OF THE BOMBAY PRESIDENCY FOR THE YEAR 1902-1903' [‎43v] (80/106), British Library: India Office Records and Private Papers, IOR/V/10/313/1, in Qatar Digital Library <https://www.qdl.qa/archive/81055/vdc_100145400422.0x00005c> [accessed 30 July 2026]

Link to this item
Embed this item

Copy and paste the code below into your web page where you would like to embed the image.

<meta charset="utf-8"><a href="https://www.qdl.qa/en/archive/81055/vdc_100145400422.0x00005c">'REPORT ON THE ADMINISTRATION OF THE BOMBAY PRESIDENCY FOR THE YEAR 1902-1903' [&lrm;43v] (80/106)</a>
<a href="https://www.qdl.qa/en/archive/81055/vdc_100145400422.0x00005c">
	<img src="https://iiif.qdl.qa/iiif/images/81055/vdc_100000000812.0x0001dc/IOR_V_10_313_0091.jp2/full/!280,240/0/default.jpg" alt="" />
</a>
IIIF details

This record has a IIIF manifest available as follows. If you have a compatible viewer you can drag the icon to load it.https://www.qdl.qa/en/iiif/81055/vdc_100000000812.0x0001dc/manifestOpen in Universal viewerOpen in Mirador viewerMore options for embedding images

Use and reuse
Download this image