The record is made up of 1 item (56 folios). It was created in 1904. It was written in English. The original is part of the British Library: India Office The department of the British Government to which the Government of India reported between 1858 and 1947. The successor to the Court of Directors. Records and Private Papers Documents collected in a private capacity. .
Transcription
This transcription is created automatically. It may contain errors.
BOMBAY ADMINISTRATION REPORT.
Chap. IV.
PRODUCTION
AND
DISTRIBUTION.
Nasrat Canal.
Fuleli Canal.
Hasanali Canal.
Alibahar.
Great Marak.
Sarfrdz Wall.
Works for which
only Revenue
Accounts are kept.
Surveys.
62
[1903.1
nearly finished. Notwithstanding the silting up of the mouth of the feeder Dhard tl
/ ! 1 /11 rl Tint. K!n ff AT- OT.Tr rl«%
canal and its branches worked satisfactorily and the crops did not suffer any dam
in a few places where they were attacked by locusts.
An area of 1,848 acres was allotted during the year, of which 937 acres
to local people, 539 to the Forest Department, and 372 to other Colonists
recommended for special grants.
^ as give 5
and
person
The capital outlay of the year on the Nasrat Canal was Rs. 2,97,497 on Wbrks
masonry works in progress last year were completed and amongst Jdie new works comment
AUCDO W J_L JL J T T W A XV WJ X JLJ. X V/ — - J JL ' _ - -
were two Fall Regulators, six combined bridges and regulators (tour ot which were out
main canal), two regulators on branches, and four Inspection Chowkis. The work
widening the main canal, which involved very heavy earthwork, was completed.
The outlay on water courses on behalf of the Colonization Officer and recoverable froi
Colonists and other grantees was Rs. 1,13,540. Distributaries designed to give indepembi
supplies to sixteen villages situated in the desert, and which are dependent on the Nasrat
were commenced and nearly finished. The large and extended Nasrat Canal was openg
for irrigation on May 26th. The length of the original canal with its branches was onli
64 miles while the length of the extended canal and its branches omitting about 2(
distributaries, which are not completed yet, is 165 miles. The greatest depth of wafei
admitted into the canal was about 3 feet more than the designed full supply depth of lfl '5
feet. The new banks stood well, and the canal and branches worked very satisfactorily
The maintenance charges amounted to Rs. 48,183.
Allotments were granted during the year to the extent of 40,500 acres.
The capital outlay of the year on the Fuleli Canal wasRs. 25,343 ( f Works * only),
Rs. 1,886 were spent on the completion of distributaries for rabi cultivation from theEsca^
The contour survey in Hyderabad, Guni and Dero Mohbat Talukas was completed and %
in the Bago Tando and Badin Talukas was in progress, the expenditure during the year beJ
Rs. 7,640. The improvements to the Pandhiwah commenced last year were in progres
the expenditure being Rs. 6,603.
Rupees
Indian silver coin also widely used in the Persian Gulf.
6,017 were spent on excavating an Escape to Is
Gajawah with the object of utilizing the water of the Gajawah, the lower portion of whicl
is now fed by the Hasanali Canal. The excavation of Distributaries from the Nasirwal
Diversion was commenced, the expenditure being Rs. 8,197. The Fuleli and its brandies
were maintained at a cost of Rs. 1,25,038 including Work and Navigation Establish
1,038 boats plied during the year as against 910 last year. The quantity of produce carriej
was about 600,000 maunds as compared with 500,000 during the previous year. The receipts
from fees on boats and steam launches amounted to Rs. 8,433, and Rs. 2,104 was ex 1
for the benefit of Navigation.
The Hasanali Canal which was in progress during the previous year was nearlj
completed and the capital outlay during the year was Rs. 86,90*3. The canal audits
distributaries worked well but owing to the work not being completed before the openiw
of the canal, and to the banks being new, the full supply could not be admitted, ii
estimate for enlarging the Head Regulator, which is not wide enough, has been sanctioDei
by Government and the work will be carried out before the inundation of 1904. The
was maintained in good order at a cost of Rs. 3,983. This being the first year
opening of the canal the zemindars were not prepared for the increased supply but in
years a large increase of cultivation is anticipated. The result of this work, which will
when completed about Rs. 2,00,000, is that a discharge of over 400 cubic feet per se
direct from the Indus has been provided in the Fuleli Canals District, so that the cost per
cusec is only Rs. 500.
The Alibahar Canal and its six branches received a good supply and worked well,
was maintained at a total cost of Rs. 4,940.
On the Great Marak Canal, certain extensions and improvements at a cost of Rs.
were carried out. A second class chowkey, a regulator at the head of a branch
and some other small works were completed. The canal and its branches, which
well, were maintained at an expenditure of Rs. 23,889 including 'Work Establishment ; .
The expenditure on maintenance including f Work Establishment ^ of the Sarfraz 1
amounted to Rs. 10,464 against Rs. 13,012 in the previous year. The canal witli
branches worked well but as its mouth silts considerably and causes it to cease
early it is proposed to cut a new mouth.
The principal canals under this head are the Naulakhi, Mehrab, Dambro, Ren, Ohn
Mahmudo and Nasir. All the canals worked well and the cultivation is likely to sho^
large increase over that of last year. Several works of Extensions and Improvements ^
carried out at a cost of Rs. 13,582, and the cost of maintenance including f Work Establish
ment' amounted to Rs. 1,49,013.
The contour survey of the Central Hyderabad Canals District, estimated to cost
Rs. 20,332, was commenced and the field work nearly completed at a cost of Rs.
Lines of levels 2 miles apart were run from West to East and 5 miles apart from North
South. The contour survey of part of the Jati T^luka in Karachi District was comment
^ ■ T
Ik 11 ,'
5k °?
front
P<!!>
toDeces 81
As
ev:
^necessary
tfoMrogra
fere car
miles
d at iflte
Hastell Current I
The maxima
U4 September
a lo’o i
iy August
1 st April 1903 wh
34 feet. The low
A comparison
Septemberin 190.
June
July
Augn
Septe
Avers
Maxi:
Mini]
Mini
tue mimmui
* foot of wa
in the previous yt
The maxima
at 16 feet below i
estimate
SJi
G,
About this item
- Content
Annual administration report of the Bombay Presidency The name given to each of the three divisions of the territory of the East India Company, and later the British Raj, on the Indian subcontinent. , providing a summary record of the main events and developments in each department of the Government of Bombay From c. 1668-1858, the East India Company’s administration in the city of Bombay [Mumbai] and western India. From 1858-1947, a subdivision of the British Raj. It was responsible for British relations with the Gulf and Red Sea regions. during the financial year 1903-04. The report was printed at the Government Central Press, Bombay [Mumbai] in 1904.
The report is divided into two parts. Part I contains a report ‘SUMMARY’ (ff 60-68). Part II comprises chapters I-IX (ff 69-112).
PART II comprises the following:
- ‘CHAPTER I. TRIBUTARY STATES’ (ff 69-75), consisting of: I. North Gujarát; II. South Gujarát; III. North Konkan; IV. South Konkan; V. The Deccan; VI. Southern Mahratta Country States; VII. Sind [Sindh]; VIII. Aden
- ‘CHAPTER II. ADMINISTRATION OF THE LAND’ (ff 76-78), consisting of: 1. Realization of Land Revenue; 2. Surveys; 3. Settlements; 4. Waste Lands; 5. Wards and Other Estates; 6. Revenue and Rent-paying Classes
- ‘CHAPTER III. PROTECTION’ (ff 79-84), consisting of: 1. Course of Legislation; 2. Police; 3. Wild Animals and Venomous Snakes; 4. Chemical Analysis; 5. Criminal Justice; 6. Prisons - Civil and Criminal; 7. Civil Justice; 8. Registration; 9. Local Board Administration; 10. Municipal Administration; 11. Military (Volunteering); 12. Marine
- ‘CHAPTER IV. PRODUCTION AND DISTRIBUTION’ (ff 85-101), consisting of: 1. Agriculture; 2. Weather and Crops; 3. Horticulture; 4. Forests; 5. Mines and Quarries; 6. Manufactures and Industries; 7. Trade; 8. Public Works; 9. Irrigation; 10. Railways; 11. Tramways
- ‘CHAPTER V. FINANCIAL REVIEW’ (ff 102-107), consisting of: 1. Financial Review, 1903-1904; 2. Mint; 3. Currency; 4. Land Revenue; 5. Irrigation Revenue; 6. Public Works Revenue; 7. Customs; 8. Opium; 9. Salt; 10. Excise; 11. Cotton Duties Act; 12. Stamps; 13. Income Tax; 14. Forests; 15. Local Funds; 16. Municipal Revenue
- ‘CHAPTER VI. VITAL STATISITICS AND MEDICAL RELIEF’ (ff 108-109), consisting of: 1. Births and Deaths; 2. Emigration and Immigration; 3. Medical Relief; 4. Lunatic Asylums [psychiatric hospitals]; 5. Sanitation; 6. Vaccination; 7. Veterinary
- ‘CHAPTER VII. INSTRUCTION’ (ff 110-111), consisting of: 1. Education; 2. Literature and the Press; 3. Arts and Sciences
- ‘CHAPTER VIII. ARCHAEOLOGY’ (f 112)
- ‘CHAPTER IX. MISCELLANEOUS’ (f 112), consisting of: 1. Ecclesiastical Jurisdiction; 2. Stationery; 3. General Miscellaneous.
A table of contents listing the headings and sub-headings of the report is on folio 59. In a small number of instances, there are discrepancies in the spelling, phrasing or inclusion of sub-headings between the table of contents and the body of the report. In these cases, the sub-heading as it appears in the body of the report is included above.
- Extent and format
- 1 item (56 folios)
- Written in
- English in Latin script View the complete information for this record
Use and share this item
- Share this item
'REPORT ON THE ADMINISTRATION OF THE BOMBAY PRESIDENCY FOR THE YEAR 1903-1904' [99v] (86/112), British Library: India Office Records and Private Papers, IOR/V/10/313/2, in Qatar Digital Library <https://www.qdl.qa/archive/81055/vdc_100145400423.0x000004> [accessed 8 August 2026]
https://www.qdl.qa/en/archive/81055/vdc_100145400423.0x000004
Copy and paste the code below into your web page where you would like to embed the image.
<meta charset="utf-8"><a href="https://www.qdl.qa/en/archive/81055/vdc_100145400423.0x000004">'REPORT ON THE ADMINISTRATION OF THE BOMBAY PRESIDENCY FOR THE YEAR 1903-1904' [‎99v] (86/112)</a> <a href="https://www.qdl.qa/en/archive/81055/vdc_100145400423.0x000004"> <img src="https://iiif.qdl.qa/iiif/images/81055/vdc_100000000812.0x0001dc/IOR_V_10_313_0203.jp2/full/!280,240/0/default.jpg" alt="" /> </a>
This record has a IIIF manifest available as follows. If you have a compatible viewer you can drag the icon to load it.https://www.qdl.qa/en/iiif/81055/vdc_100000000812.0x0001dc/manifestOpen in Universal viewerOpen in Mirador viewerMore options for embedding images
Copyright: How to use this content
- Reference
- IOR/V/10/313/2
- Title
- 'REPORT ON THE ADMINISTRATION OF THE BOMBAY PRESIDENCY FOR THE YEAR 1903-1904'
- Pages
- 57r:112v
- Author
- East India Company, the Board of Control, the India Office, or other British Government Department
- Usage terms
- Open Government Licence
!['REPORT ON THE ADMINISTRATION OF THE BOMBAY PRESIDENCY FOR THE YEAR 1903-1904' [‎99v] (86/112) 'REPORT ON THE ADMINISTRATION OF THE BOMBAY PRESIDENCY FOR THE YEAR 1903-1904' [‎99v] (86/112)](https://iiif.qdl.qa/iiif/images/81055/vdc_100000000812.0x0001dc/IOR_V_10_313_0203.jp2/full/!1200,1200/0/default.jpg)